All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier

All-In-One Hybrid All in One Battery Cabinet 100kwh 200kwh Battery Energy Storage Container for Industrial Commercial

No reviews yet

Attributes

LiFePO4Battery Type
Off grid, Hybrid grid, On gridGrid connection
Jiangxi, ChinaPlace of Origin
HZEB-HCT-200Model Number
DawniceBrand Name
CustomationDimension (L*W*H)
Weight:others
Communication Port:Rs485, CAN, RS-232
Protection Class:IP54
Cooling:Air Cooling
Battery capacity:50kwh~500kwh
Product name:Commercial Energy Storage Battery-cabinet
Maximum Cycle Efficiency:≥90%
Certificated:CE/ROHS/MSDS/UN38.3
Cycle life:6000 Times
Warranty:10 Years
OEM/ODM:Accepatable
Operating temperature (°C):-10-55

Key attributes

Battery Type
LiFePO4
Grid connection
Off grid, Hybrid grid, On grid
Place of Origin
Jiangxi, China
Model Number
HZEB-HCT-200
Brand Name
Dawnice
Dimension (L*W*H)
Customation
Weight
others
Communication Port
Rs485, CAN, RS-232
Protection Class
IP54
Cooling
Air Cooling
Battery capacity
50kwh~500kwh
Product name
Commercial Energy Storage Battery-cabinet
Maximum Cycle Efficiency
≥90%
Certificated
CE/ROHS/MSDS/UN38.3
Cycle life
6000 Times
Warranty
10 Years
OEM/ODM
Accepatable
Operating temperature (°C)
-10-55

Packaging and delivery

Selling Units
Single item
Single package size
55X130X80 cm
Single gross weight
400.000 kg

Lead time

Product descriptions from the supplier

Warning/Disclaimer
This product has acquired the relevant product qualification(s)/license(s) of certain applicable country/countries.
1 - 49 pieces
£6,146.08
50 - 99 pieces
£5,396.56
>= 100 pieces
£4,497.13

Variations

Select now

Shipping

Shipping fee and delivery date to be negotiated. Chat with supplier now for more details.

Protections for this product

Secure payments

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Standard refund policy

Claim a refund if your order doesn't ship, is missing, or arrives with product issues