Carbon Steel Pipe Schedule Carbon Steel Tube and Low Alloy Steel Pipe in China Manufacturer
No reviews yet






Attributes
By Theoretical WeightInvoicing
Non-oiledOiled or Non-oiled
RoundSection Shape
Hot RolledSurface Treatment
±1%Tolerance
Shandong, ChinaPlace of Origin
Alloy Or Not:Is Alloy
Delivery Time:within 7 days
Grade:EN DIN ASTM AiSi
Standard:ASTM
Thickness:customized
Brand Name:none
Application:Fluid Pipe, Hydraulic Pipe, Gas Pipe
Certificate:API
Length:12 m
Processing Service:Cutting
Special Pipe:Other
Key attributes
Invoicing
By Theoretical Weight
Oiled or Non-oiled
Non-oiled
Section Shape
Round
Surface Treatment
Hot Rolled
Tolerance
±1%
Place of Origin
Shandong, China
Alloy Or Not
Is Alloy
Delivery Time
within 7 days
Grade
EN DIN ASTM AiSi
Standard
ASTM
Thickness
customized
Brand Name
none
Application
Fluid Pipe, Hydraulic Pipe, Gas Pipe
Certificate
API
Length
12 m(39.37ft)
Processing Service
Cutting
Special Pipe
Other
Packaging and delivery
Selling Units
Single item
Lead time
Product descriptions from the supplier
1 - 9 tons
$556
>= 10 tons
$550
Quantity
Shipping
Shipping fee and delivery date to be negotiated. Chat with supplier now for more details.
Item subtotal
$0.00
Shipping total
To be negotiated
Subtotal
$0.00
4 interest-free payments with
Alibaba.com order protection
Secure payments
Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols
Money-back protection
Claim a refund if your order doesn't ship, is missing, or arrives with product issues













