All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier
≤1h
Response Time

Fulfillment Center With Overhead Fan System and Emergency Lighting Grid

No reviews yet
£30
500 - 1,999 square meters
£27
2,000 - 4,999 square meters
£2474
5,000 - 9,999 square meters
£1497
≥ 10,000 square meters

Quantity

Key attributes

Model Number

Industrial workshop

Tolerance

±1%

Place of Origin

Hebei, China

Delivery Time

31 ~ 45 days

Standard

GB

Brand Name

FOREST

Shipping

Shipping fee and delivery date to be negotiated. Chat with supplier now for more details.
Item subtotal
£0.00
Shipping total
To be negotiated
Subtotal
£0.00

Key attributes

Application
Steel Workshop
Standard
GB
Tolerance
±1%
Type
Heavy
Processing Service
Bending, Welding, Decoiling, Cutting, Punching
Delivery Time
31 ~ 45 days
Model Number
Industrial workshop
Place of Origin
Hebei, China
Brand Name
FOREST
Product name
Prefabricated Steel Structure Workshop Building
Purlin
C/Z Galvanized Steel(Q235)
Main frame
Solid H-shape Steel Beam
Application Fields
Steel Structural Fabrication Construction
Keyword
Steel Structural Steel Frame Workshop
Roofing
Sandwich Panel. Single Steel Sheet
Surface treatment
Painted
Material
Q235B/Q345B Low Carbon Steel
Color
Customized Color
Window
Aluminum Alloy Window
Certificate
CE/ ISO9001
Door
Sliding Door
Structure type
Long-span Grid Structure
Main structure
Customzation Size

Packaging and delivery

Selling Units
Single item

Lead time

Product descriptions from the supplier