PT EVERSTAR CONSTRUCTION MACHINERY
JAKARTA BARAT, ID4 yrsMultispecialty Supplier
≤3h
Response Time
High Efficiency High Operating Efficiency Engine Pile Driver Used Pump Motor for Guardrail Installation Sheet Pile Construction
No reviews yet
Complies with EU standards£8,03223
1-4 sets
£7,64974
5-9 sets
£7,26726
≥10 sets
Model Number
Power
Customization options
Customized logo (Min. order: 1 set)
Customized packaging (Min. order: 1 set)
Graphic customization (Min. order: 1 set)
Supplier’s customization ability
Key attributes
Piling Speed (m/min)
2m/min
Brand Name
EVER STAR
Core Components
Engine, Motor, Pump
Place of Origin
Jiangsu, China
Weight
4800 kg
Warranty
1 Year
Shipping
Select shipping
Alibaba.com order protection
Secure payments
Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols
Money-back protection
Claim a refund if your order doesn't ship, is missing, or arrives with product issues
Key attributes
Piling Speed (m/min)
2m/min
Brand Name
EVER STAR
Core Components
Engine, Motor, Pump
Place of Origin
Jiangsu, China
Weight
4800 kg
Warranty
1 Year
Unique Selling Point
High operating efficiency
Video outgoing-inspection
Provided
Machinery Test Report
Not Available
Efficiency
about 300 post /day
Dimension (L*W*H)
2700*2650*4200MM
Name
Pile Driver Guard Rail Construction Highway Installation
Hydraulic hammer model
YC260,YC230
Advantages
Quality cylinder engine, cooler etc
Mast route
2000 mm
drilling depth
1700 mm
Walking speed
5000-12000 m/h
Borehole diameter
6-300mm
Application
fence installation
Color
Customers Request
Optional features
Piling, drilling and drawing piles
Packaging and delivery
Selling Units
Single item
Lead time
Customization options
Customized logo(+ from /Min. order: 1 set)
Customized packaging(+ from /Min. order: 1 set)
Graphic customization(+ from /Min. order: 1 set)
View details

















