≤2h
Response Time
Prestressed Duct Grout with High Flowability for Bridge Girder Post Tensioning and PT Cable Protection
No reviews yet
£7703-9243
Minimum order quantity: 20 tons
Color
Type
Customization options
Customized logo (Min. order: 100 tons)
Customized packaging (Min. order: 200 tons)
Graphic customization (Min. order: 200 tons)
Key attributes
After-sale Service
Online Technical Support
Project Solution Capability
total solution for projects
Application
Garage Shed, Storage Closet, Hotel, Villa, Apartment, Office Building, Hospital, School
Design Style
Industrial
Feature
preventing corrosion and bonding
Place of Origin
Hunan, China
Shipping
Select shipping
Key attributes
After-sale Service
Online Technical Support
Project Solution Capability
total solution for projects
Application
Garage Shed, Storage Closet, Hotel, Villa, Apartment, Office Building, Hospital, School
Design Style
Industrial
Feature
preventing corrosion and bonding
Place of Origin
Hunan, China
Grade Standard
Industrial Grade
Warranty
1 Year
Brand Name
Luzhi
Model Number
LZ-L1
Part Number
LZ-L1
Brand
Lu Zhi
Product Name
Prestressed Duct Grout for Post Tensioning Bridge Construction
Appearance
grey powder
Dosage
0.26-0.28%
Package
25kg/bag
Shelf Life
12 months
Certification
ISO 9001:2015, ISO 14001:2015, ISO 45001:2018
Material
Cement
Features
High fluidity, no seepage, no stratification, and full grouting
Technical index
The initial flow time at 25℃ is no more than 17 seconds
Application
Precast,infrastructure concrete,roads, bridges, and tunnels
Packaging and delivery
Selling Units
Single item
Lead time
Customization options
Customized logo(+ from /Min. order: 100 tons)
Customized packaging(+ from /Min. order: 200 tons)
Graphic customization(+ from /Min. order: 200 tons)
View details








